What is the "Carry Over Percent" in the Arm Module
Workaround:
Certain ARM notes provide the ability to store unused rate increases which were blocked by the rate caps for use at a later time when a change in interest rate did not reach the cap amount for that period.
ARM Module>ARM Information tab>Carry over check box
Carry Over
Select this check box if there is a carry over to future adjustments. Currently, the ARM calculation does not fully support the carry over feature.
ArticleNumber:
000061610